35+
Years in Business
4.8★
Google Rating
2,500+
Projects Completed
100%
Licensed & Insured

Remove what's failed, keep what's solid

Asphalt milling is the process of grinding away the top layer of pavement using specialized equipment. It removes damaged, worn, or uneven asphalt at a precisely controlled depth β€” down to 1, 2, or 3 inches depending on the project requirements.

Milling is an essential step before resurfacing and overlays. It creates a clean, textured surface that new asphalt bonds to properly. Without milling, overlays can slip, crack at joints, and fail prematurely. Milling also maintains proper curb heights, drainage grades, and clearances at structures.

W&S Asphalt Paving operates milling equipment capable of handling everything from residential driveways to large commercial parking lots. Our machines cut to exact depth specifications and leave a grooved surface that's ideal for receiving fresh asphalt.

The removed material β€” called millings or RAP (Reclaimed Asphalt Pavement) β€” is fully recyclable. It can be used for temporary surfaces, shoulder stabilization, or recycled back into new asphalt mix. Nothing goes to waste.

🎯

Precision Depth Control

Our milling equipment removes asphalt at exact specified depths β€” 1 inch, 2 inches, or full-depth β€” with consistent results across the entire surface.

πŸ”—

Better Overlay Bond

Milled surfaces create a rough, textured profile that new asphalt grips to. This prevents slippage and extends the life of your overlay.

πŸ“

Grade & Height Correction

Milling lets us maintain proper curb reveal, drainage slope, and door clearances β€” critical for commercial properties.

♻️

100% Recyclable

Removed asphalt millings are recycled into new pavement material or reused for temporary surfaces. Zero waste to landfill.

When milling is the right solution

πŸ”„

Before Resurfacing

Milling creates the ideal bonding surface for overlays and maintains proper elevation after new asphalt is applied.

πŸ“

Height Correction

When multiple overlay layers have built up over the years, milling brings the surface back to the correct elevation.

πŸ’§

Drainage Restoration

Milling can re-establish proper slope and grade to eliminate standing water caused by uneven surfaces.

🚧

Partial Removal

Remove only the damaged top layer while preserving a solid base β€” saving time and money on repair projects.

πŸ—

Full-Depth Removal

Complete asphalt removal down to the base when pavement has failed beyond repair. Faster and cleaner than traditional demolition.

♻️

Material Recycling

Reclaimed asphalt pavement (RAP) from milling is recycled into new hot-mix or used for temporary surfaces and shoulders.

Milling β€” clean, controlled, efficient

Professional milling that sets the foundation for a perfect finished surface.

01

Survey & Plan

We assess the existing surface, determine the required milling depth, and plan the work sequence to minimize disruption.

02

Milling

Our milling machine removes asphalt at the specified depth. Continuous conveyors load millings directly into trucks for removal or recycling.

03

Cleanup

The milled surface is swept clean and inspected for proper depth, grade, and texture. Any soft spots in the base are identified and addressed.

04

Ready for Paving

Tack coat is applied and the surface is ready for fresh asphalt. Most milling and paving projects are completed back-to-back.

Common questions

What you should know about asphalt milling.

What is asphalt milling?
Milling is the controlled grinding and removal of the top layer(s) of asphalt pavement using a specialized machine. It removes damaged material at a precise depth while leaving the base intact for resurfacing.
How much does asphalt milling cost?
Milling typically costs $1–$3 per square foot depending on depth, area size, and disposal requirements. It's usually combined with resurfacing or repaving for a complete project quote.
Why is milling necessary before an overlay?
Milling creates a textured surface that new asphalt bonds to properly. It also maintains correct curb heights and drainage grades. Without milling, overlays can slip, crack at transitions, and fail prematurely.
What happens to the removed asphalt?
Milled asphalt β€” called RAP (Reclaimed Asphalt Pavement) β€” is 100% recyclable. It gets processed and mixed into new asphalt or used for base material, temporary roads, and shoulder stabilization.
Is milling noisy?
Yes, milling equipment is loud while operating. We schedule work during business hours and coordinate with property managers to minimize disruption. Most residential milling is completed within a few hours.

Start with a clean surface.

Get a free estimate for milling and resurfacing your property.

Get Your Free Estimate → (813) 685-4708